The progress at The Woodlands of Charlottesville is going great! Some of our Buildings have already been painted and bricked. Crown Molding has already been installed, along with the custom cabinetry, ceiling fans, bathroom sinks and toilets, and even the thermostats!

Below are some current interior highlights:


Thermostats are installed.



A bedroom in an end unit. Note the vaulted ceilings.



Imagine having your own full bathroom.



Another shot of a bedroom.

Hello! Here are the latest construction photos, taken yesterday afternoon.



The beautiful Stone Face is getting built at the future site of one of the entry gates.
Building 5 left, Building 4 Right.




A closeup of the Stone Face, with Building 5 in the background.



A view of Building 5. Check out the side porch and patio!



The 8000 sq. ft. clubhouse is starting to take shape!



Another view of the clubhouse (right) and future site of the pools (left).